Adaro Energy Jobs: Operation Shift Leader | EPC Commercial Officer

Adaro Energy JobsWe are an Indonesian energy group that focuses on integrated coal mining through subsidiaries. Our principal location is at Tabalong district in South Kalimantan, where our subsidiary PT Adaro Indonesia operates the largest single-site coal mine in the southern hemisphere. We operate under a first-generation CCA (coal co-operation agreement) with the Indonesian Government valid until 2022.
From our South Kalimantan mine’s three pits we produce one of the world’s cleanest coals, trademarked Envirocoal. It is a sub-bituminous, moderate calorific value coal producing ultra-low sulphur, ash and NOx emissions.
We are proud of our record of continuous growth over the two decades that we have been mining in Kalimantan. In 2014 we delivered 56.2 million tonnes of coal, and in 2015 we plan to produce between 54 million and 56 million tonnes.
Our coal is primarily sold to power generation providers, and we sell an average of about 25% of our coal to customers domestically in Indonesia and 75% to overseas customers, predominantly in Asia.

Operation Shift Leader - Kalimantan Selatan

Job Responsibilities

  • Responsible for overseeing and coordinating the operation of the equipment and maintaining the safety and the efficiency of the power plant and auxiliary plant at the control room.
  • To apply the safety rules and procedures in the Company in accordance with the quality management in the Company to support the safety and smooth operation of the Power Plant.
  • To control the operational shift of Power Plant in all circumstances to maintain the availability of the Power Plant.
  • To monitor and guide all required activities for equipment.
  • To investigate and to provide the solution arising to the Plant (trouble, abnormal operational condition, danger sign) and provide the solution to be followed up to support the continuity and availability of Power Plant.
  • To prepare Faults Report from force stage and to prepare and also to review the quality and accuracy of the required information to be reported to the Maintenance Department for further corrective action.
  • To publish Permit-to-Work and isolation accurately and timely manner for the continuity and Power Plant maintenance.
  • To ensure the accuracy and completeness of Plant Quality Records which has been completed to ensure all Power Plant activity is documented.
  • To ensure the achievement of relevant procedures and Work Instructions at Quality Management System during conduct the daily works following Management Standard.
  • To make a daily report, work order, and record the usage of the material in conducting the work to support the continuity of operations and maintenance of Power Plant. 

Job Requirement

  • Minimum Bachelor’s Degree (S1) graduate majoring in Mechanical or Electrical Engineering
  • Minimum 3 years of experience as Shift Leader position in power plant or manufacturing 
  • Broad experience and proven skills in coal-fired power plant operation will be an advantage.
  • Preferably having a valid Power Plant Competency Certificate (IATKI / HAKIT)
  • Good communication skill, leadership and managerial skill in supervisory level
  • Good command in English both verbal and written 
  • Willing to be located at Tanjung - Tabalong, South Kalimantan
  • Status: Permanent
  • Closing date: April 30, 2019

EPC Commercial Officer - Jakarta

Job Responsibilities

  • Analyzing and providing various EPC contracts, schedule, and also activities related to EPC management to represent Adaro Power’s interests in the project consortium through the bidding, development and / or implementation stages, financial close and the post-financial close activities to facilitate top management decisions 
  • Provide all documentation related to feasibility study, bidding and development phase related to EPC contractor selection in order to facilitate business decisions on the latest projects undertaken by Adaro Power.
  • Provide analysis on the structuring of the project agreements, and the consultancy agreements with third party advisors in relation to EPC contract.
  • Support the financing team activities with regards to EPC contract, and related to the Lender’s due diligence processes and negotiations of the Financing Agreements.
  • Provide analysis for the implementation of the EPC schedule, cost, budget, tender documents and quotations, pre-contract management and change order claims and dispute resolutions .
  • Prepare progress report related to EPC Management issues .

Job Requirement

  • Minimum Bachelors' Degree graduates majoring in Civil / Electrical / Mechanical Engineering or Law 
  • Minimum 2 years of experience in Project Management or Commercial or Contracts Management in construction projects (preferably in power plant or other electrifications projects)
  • Good understanding of IPP Bidding Process and Commercial Contract will be an advantage 
  • Good command in English both verbal and written 
  • Status: Permanent
  • Closing date: April 18, 2019
Those who are interested please apply to links below.
Adaro Group has never asked our prospective job applicants to transfer some money for recruitment process.